top of page

Inside a Flip

This project took some time but it ended up being one of the nicest. Sub contracted the hardwood floors to a guy with decades of experience. We did a #bona commercial natural finish on 100 y/o maple floors. I sub contracted the electrical because we converted from knob and tube to a breaker panel and brought everything to code in the kitchen and the bath. There is a #Danze pot filler, a whirlpool double oven, range hood and I kept the laundry chute. #fixitnow #kitchenremodel #forclosure #fixandflip #fixit www.1-833-MYFIXIT.com 1-833-MYFIXIT www.1833MYFIXIT.COM


Commenti


I commenti sono stati disattivati.
bottom of page